The engine was put on a test stand where it was run for 6 heat cycles. The bolts were retorqued and the valves adjusted. It is now ready to go into the Dino.
The engine was put on a test stand where it was run for 6 heat cycles. The bolts were retorqued and the valves adjusted. It is now ready to go into the Dino.